Loreto Sixth Form College, Manchester

A 5 storey, multi-functional, further education building located on the outskirts of Manchester City Centre.

project icon

The Project

A state of the art teaching facility for Performing Arts, Music, Media, English, IT, 3D Design and Graphics also incorporating a Learning Resource Centre and Library.

project icon

Project Objectives

To deliver a contemporary building that realises the aspirations of the end users and creates a state of the art teaching facility, combining sustainable technology solutions to their maximum. This included a 30,000 litre underground rainwater harvesting tank, 270 m2 photovoltaic array, 128m deep vertical ground source heat pumps, 30 m2 of solar thermal panels and a natural ventilation system all of which provide heating, cooling and power to the college.

project icon

Project Challenges

The main challenge for this project was the coordination of mechanical and electrical services within the first and third floor plantroom spaces. We produced 3D models of the plantrooms in order to ensure all coordination problems were dealt with prior to installation works commencing. The third floor plantroom was also located above a Music Recording Studio, for which we liaised with our supply chain to gain expertise on reducing noise levels within the plantroom; this resulted in specific pipework/plant bracketry systems being installed.

project icon

The Results

The project was completed on programme which enabled the college to occupy the building and fit out prior to students returning in September. The project rating was completed with minimum defects with an ‘Excellent’ BREAM rating.

Meet the Team

Dave Edwards, Project Manager

Dave provided expertise, knowledge and support to his team throughout the design and construction process. His attention to detail ensured that the project was completed within the contract duration and commissioned correctly, incorporating all of the sustainable technology solutions.

“Bardsley Construction appointed HE Simm to undertake the Mechanical & Electrical installations. Bardsley found HE Simm to be very helpful overcoming design and coordination problems at critical times during the construction sequence. HE Simm ensured all critical dates were achieved to ensure the successful completion.”

Frank Gillon, Senior Project Manager, Bardsley Construction

Location